Early History (further information upon request)

  • 1998 to 2000 - Development manager, software and hardware
  • 1994 to 1998 - HW/SW design / manufacture embedded system
  • 1990 to 1998 - Contract HW/SW for IBM Twinax/Coax printer connectivity
  • 1988 to 1992 - Embedded systems for Wang mini-computer printer connectivity
  • 1987 to 1990 - Design / manufacture of Point of Sale terminals
  • 1984 to 1992 - HW/SW for IBM Bus & Tag and ICL Oslan connectivity
  • 1974 to 1984 - ITV Broadcast Engineer (various roles) to Supervisory Engineer


© P2 Controllers Ltd. (2022) (Privacy/Legal/About)